Infrastructure
Communication sites and towers built and organised to a documented standard — ODF layout, rack organisation, cable management and labelling.
The challenge
Scope of work
What we did
We prepared the sites, installed and commissioned the equipment, and imposed a documented standard on the physical layer: ODF layout planned before termination, racks organised by function, cable management routed and secured, every port labelled to a scheme.
Technologies
Site visit, current-state assessment and honest constraints.
Topology, capacity, redundancy and a bill of materials you can review.
Installation, labelling, configuration and commissioning tests.
Ongoing monitoring, maintenance windows and field support.
Outcome
The sites can be worked on by an engineer who has never visited them, because the labelling and the records say what is where. Field maintenance and support continue after handover.
Tell us what needs to be built and our engineers will scope it honestly.